Advertisement
Nuaire
Nuaire

Flood Prevention in the Lab

By | June 24 2010

Advertisement
Thermo Scientific
Thermo Scientific

Floods in the laboratory must be avoided because they are costly and can cause serious damage, disruption, and personal injury.

Floods result when circulating water escapes from hoses that burst or have connections that fail.

Below are some tips to help avoid creating floods while operating water cooling equipment.

Water-cooled condensers

  • Use thick-walled, reinforced tubing, such as a braid-reinforced PVC, on all water-cooled systems. It's more durable than rubber and more resistant to splitting. Connections must be made with hose clamps.
     
  • Drain hoses from water-cooled systems must be firmly attached in the drain line.
     
  • The use of electrothermal flow monitors are required for water-cooled solvent stills.
      
  • For situations where water-cooled condensers are run continuously, a pressure-sensitive flow detector must be installed on the water outlet feeding the condenser.

Laser units

  • Thick-walled, reinforced PVC tubing or copper tubing should be used. Connections must be made with hose clamps, or compression fittings. Rubber tubing or connections held with wire should not be used.
     
  • Drain hoses from water-cooled lasers must be firmly attached in the drain line.
     
  • For situations where water-cooled lasers are run continuously, a pressure-sensitive flow detector must be installed on the water outlet feeding the unit.
     
  • New laser cooling systems must be installed according to manufacturer's specifications.

Install and maintain hose connections to condensers with care!

  • Use only PVC hoses of the appropriate diameter and thickness for carrying the cooling water. Rubber hoses will crack or split with time because they are susceptible to chemicals and should be replaced frequently. Hoses that are too small or too large in diameter cannot be properly secured.
     
  • Secure hoses to the nozzle of the water line and to the inlet and outlet of the condenser with appropriately sized metal or plastic hose clamps or with plastic locking disconnects. Wire is not a substitute.

Things to remember

  • Make sure the drain is not clogged or blocked.
     
  • Make sure exit hoses are well secured in the sink drains by having a long piece of metal tubing secured in the drain and connected to the exit tube.
     
  • Install a pressure regulator on the inlet lines to equipment such as solvent stills that are used for extended periods.
     
  • Whenever possible, avoid running water overnight or on weekends.

Conduct a visual inspection of all cooling water hoses in your laboratory on a monthly basis and replace as necessary.

DO

  • Do use braid-reinforced PVC hoses, or something equivalent.
     
  • Do conduct a visual inspection of all cooling water hoses in your laboratory on a monthly basis and replace as necessary.
     
  • Do avoid running water overnight or on weekends.
     
  • Do make sure the drain is not clogged or blocked.

DO NOT

  • Do not use rubber tubing or wire to make connections on water-cooled systems.
     
  • Do not use rubber tubing or wire to make connections to laser units.
     
  • Do not use rubber hoses, they are susceptible to chemicals and will crack or split with time.

Categories

Safety Tips

Add a Comment

Avatar of: You

You

Processing...
Processing...

Sign In with your LabX Media Group Passport to leave a comment

Not a member? Register Now!

LabX Media Group Passport Logo
Advertisement
Get Help with Your Lab Equipment
?or help others.

Build your Lab Bench and get notifications and updates for the lab equipment you own!

www.labwrench.com
  • Facebook
  • LinkedIn
  • Twitter
  • Vimeo
  • RSS
Now Available in the App Store!

Related Articles

Advertisement
Shimadzu Scientific
Shimadzu Scientific

Subscribe to the Magazine

Click Here for your free subscription to Lab Manager Magazine®

E Newsletters

Click Here to subscribe to any of the following Lab Manager Magazine® E Newsletters

  • Lab Manager Magazine Weekly Monitor
  • New Product Alerts
  • eAnalytical Monthly
  • eLifeScience Monthly
  • eLab Equipment Monthly
  • Product Surveys and Event Promotions
  • Events and Webinars
Sign Up for Newsletters

Lab Video

Advertisement
See All Lab Videos
  • Facebook
  • LinkedIn
  • Twitter
  • Vimeo
  • RSS
Now Available in the App Store!

Page Generated: June 19 2013

Advertisement