The Operational Details Behind a Successful Lab Design

Lab managers and facilities teams bring different perspectives to design decisions. Reviewing them together can reveal problems before construction begins

Written byLauren Everett
| 3 min read
end users, facilities, and lab design teams meeting about a lab design project
Register for free to listen to this article
Listen with Speechify
0:00
3:00

A lab renovation gives managers an opportunity to address crowded work areas and workflows that no longer fit the science. Before approving a layout, however, managers should also ask how the proposed space will function when equipment needs service or building systems require attention. Those conversations belong in planning meetings alongside discussions about bench space and instrument placement.

In “Why Facilities Teams Should Have a Seat at the Lab Design Table,” Lab Design News managing editor MaryBeth DiDonna reports on the value of involving facilities personnel early in laboratory projects. Pam Paddock, managing director, life sciences at JLL, describes maintenance-access problems and emphasizes collaboration with end users.

Before approving a design, lab managers should work with facilities colleagues to review how the space will support daily work and what routine maintenance will require.

Translate laboratory needs into operating requirements

Before reviewing drawings together, prepare a description of how the lab operates. Identify which activities require continuous service and which can accommodate planned interruptions. Include differences between normal operations and peak demand.

Replace broad requests such as “we need reliable utilities” with questions the project team can investigate. Which instruments require uninterrupted power? How long can a process pause? What happens to samples if an environmental condition moves outside its acceptable range?

Bring instrument requirements and relevant procedures to the discussion. Ask facilities personnel and the design team to identify missing information, conflicting assumptions, and requirements that need specialist review.

Document the answers in a shared requirements record. Assign someone to resolve each open question before the team approves the affected design decision. This gives the manager a way to track whether the project addresses the lab’s needs.

Review maintenance as part of the workflow

Paddock told Lab Design News that piping, sprinkler placement, and access panels can create maintenance difficulties when teams overlook access during design. She also identified construction walkthroughs, particularly before ceilings close, as opportunities to review installed conditions.

Use that perspective to organize a joint review around a routine service task. Ask facilities colleagues to walk through how they would reach and maintain a component shown on the plans. Then examine the implications for laboratory work. Would personnel need to move an instrument or clear a bench? Would maintenance require restricting access to an area? Which activities would need to pause, and who would authorize restarting them?

Lab Design News logo

Interested in lab design?

Register for a FREE Lab Manager account to subscribe to the Lab Design Newsletter from our sister site, Lab Design News.
Subscribe for Free

For each unresolved conflict, request options from the project team. A manager might ask the team to compare changing an access location with accepting a recurring interruption. Record the decision and its operating implications so future staff understand the tradeoff.

Evaluate finishes against actual use

DiDonna’s article also highlights facilities teams’ experience with material durability and maintenance. Paddock cautions that some visually appealing finishes may perform poorly over time.

To apply that advice, give the project team a written description of anticipated exposure and cleaning practices. Ask the appropriate specialists and suppliers to assess proposed materials against those conditions.

Include the people who clean and maintain the space in the review. Ask what upkeep each option requires and how a damaged section would be repaired or replaced. Where appropriate, request samples for an approved evaluation.

When comparing options, ask for installation and maintenance costs alongside purchase prices. If the team recommends a more expensive material, request a clear explanation of the expected benefit and the evidence supporting it.

Define the changes worth planning for

Paddock also discusses planning for changing research needs, including possible conversion between dry and wet laboratory functions.

Managers can make that discussion more useful by naming plausible changes. Identify a likely equipment addition or a proposed method that would alter the lab’s service requirements.

Ask the design and facilities teams to compare accommodating that change now with modifying the space later. What would each approach cost? What disruption would later work require? Which assumptions depend on an uncertain research or funding decision?

Use those answers to prioritize provisions with a clear purpose. Record which future scenarios the approved design supports and which would require further investment.

Carry decisions through to occupancy

Set review points with the project lead before construction begins. Specify which decisions require laboratory input, when facilities personnel should inspect relevant work, and who will communicate changes affecting operations.

Before occupancy, request the information your team needs to use the space: service contacts, shutdown procedures, maintenance arrangements, and any operating restrictions. Assign responsibility for keeping those records current.

Schedule a joint review after staff have used the laboratory. Compare actual experience with the requirements documented during planning, then assign follow-up actions.

The lab manager’s contribution continues beyond approving drawings. Keeping scientific requirements connected to facilities decisions gives the team a shared basis for evaluating whether the completed space supports the work.

Frequently Asked Questions (FAQs)

  • Why is it important to involve facilities personnel in lab design projects?

    Involving facilities personnel early ensures that maintenance-access problems are addressed and that the design meets the actual operational needs of the lab.

  • How can managers effectively translate laboratory needs into operating requirements?

    Managers should prepare a detailed description of lab operations, identify routine service needs, and ask targeted questions that the project team can address.

  • How can managers prepare for future changes in lab design projects?

    Managers should identify potential changes, compare the costs and disruptions of accommodating those changes now versus later, and document how the design supports possible future scenarios.

Add Lab Manager as a preferred source on Google

Add Lab Manager as a preferred Google source to see more of our trusted coverage.

About the Author

  • Lauren Everett headshot

    Lauren Everett is the managing editor for Lab Manager. She holds a bachelor's degree in journalism from SUNY New Paltz and has more than a decade of experience in news reporting, feature writing, and editing. She oversees the production of Lab Manager’s editorial print and online content, collaborates with industry experts for speaking engagements, and works with internal and freelance writers to deliver high-quality content. She has also led the editorial team to win Tabbie Awards in 2022, 2023, 2024, and 2026. This awards program recognizes exceptional B2B journalism and publications. 

    Lauren enjoys spending her spare time hiking, snowboarding, and keeping up with her two young children. She can be reached at leverett@labmanager.com.

    View Full Profile

Related Topics

Loading Next Article...
Loading Next Article...
Current Magazine Issue Background Image

CURRENT ISSUE - October 2026

Why Lab Teams Resist Change—And How Leaders Can Respond

Addressing the human side of automation, AI, and operational change

October 2026 Lab Manager Cover Image